Repository logo
 

Propuesta de rediseño estructural de pavimento en poza los alcaldes, La Lima, Cortés, 2023

dc.campusUnitec San Pedro Sula
dc.codigocarreraI-03es_ES
dc.collectionTrabajo de Investigación
dc.contributor.advisorHéctor Wilfredo Padilla
dc.contributor.authorHelen Nicole Galeano Zelaya
dc.contributor.authorMelvin Josué Mendoza Sánchez
dc.contributor.authorMoisés David Espinoza Zúniga
dc.coverageSan Pedro Sula, Cortés, Honduras
dc.date.accessioned2023-12-12T16:02:58Z
dc.date.available2023-12-12T16:02:58Z
dc.date.issued2023-12-12
dc.date.terna2023-04-12
dc.description.abstractEl proyecto est� ubicado en el sector Poza Los Alcaldes, en el primer acceso a La Lima, Cort�s. La realizaci�n de la propuesta t�cnica de un redise�o estructural de pavimento permitir� el mejoramiento en el �rea del casco urbano, as� mismo, evitar� estancamiento de aguas superficiales, inundaci�n de la parada de buses y casas aleda�as; ante la problem�tica anteriormente mencionada, el presente documento expone los estudios y las actividades realizadas para generar la actual propuesta de redise�o estructural de pavimento con una metodolog�a de estudio que define un enfoque cuantitativo y a su vez, utiliza un dise�o transversal ya que este se centra en la recolecci�n de datos basado en un alcance descriptivo y t�cnicas como ser entrevistas, levantamiento topogr�fico y ensayos de laboratorio. Este redise�o est� elaborado de acuerdo con los par�metros de dise�o establecidos por la norma Portland Cement Association y El Manual Centroamericano para Dise�o de Pavimento, obteniendo como resultado la elevaci�n de la rasante del bulevar y la calle que va hacia el centro de salud. El Redise�o de la estructura del pavimento se realiz� mediante el uso del programa BS-PCA. La secci�n del bulevar tendr� una subbase obtenida mediante un banco de pr�stamo ubicado en San Manuel, Cort�s con un valor de soporte k 450 Lbs/pulg3 o 12.456 Kg/cm3 de 25 cm de espesor y la carpeta de rodadura de concreto hidr�ulico con MR de 600 Lbs/pulg2 o 42.18 Kg/cm2 de 23 cm, as� mismo la calle que se dirige al centro de salud utilizar� la subbase con un valor de soporte K 450 Lbs/pulg3 o 12.456 Kg/cm3 de 25 cm y la carpeta de rodadura de concreto hidr�ulico con MR de 600 Lbs/pulg2 o 42.18 Kg/cm2 de 22 cm que es el espesor existente. El presupuesto del proyecto fue realizado en las hojas de c�lculo de Excel mediante un desglose de actividades presentadas en el PCO, explosi�n de insumos como materiales, equipo y mano de obra, el desglose de costos indirectos y las fichas de costo.
dc.description.abstractenglishThe project is located in the area Poza Los Alcaldes, at the first access point to La Lima, Cortés. The realization of the technical proposal for a structural redesign of the pavement will allow for an improvement of the urban area, as well as avoid stagnation of surface waters, flooding of the bus stop, and surrounding houses. Faced with the aforementioned problems, this document exposes the studies and activities carried out to generate the current proposal for structural pavement redesign with a study methodology that defines a quantitative approach and, in turn, uses a cross-sectional design since it focuses on data collection based on a descriptive scope and techniques such as interviews, topographic surveys, and laboratory tests. This redesign is elaborated in accordance with the design parameters established by the Portland Cement Association standard and the Central American Manual for Pavement Design, resulting in the elevation of the boulevard and the street that goes to the health center. The structural pavement redesign was carried out using the BS-PCA program. The section of the boulevard will have a subbase obtained through an extraction site located in San Manuel, Cortés, with a modulus of reaction of k-value 450 lb/in3 or 12,456 kg/cm3 of 25 cm thickness and a surface course of hydraulic concrete with a MR of 600 lb/in2 or 42.18 kg/cm2 of 23 cm. Likewise, the street that leads to the health center will use the subbase with a modulus of reaction of k-value 450 lbs/in3 or 12.456 kg/cm3 of 25 cm and the rolling layer of hydraulic concrete with a MR of 600 lbs/in2 or 42.18 kg/cm2 of 22 cm, which is the existing thickness. The project budget was made in Excel spreadsheets through a breakdown of activities presented in the PCO, explosion of inputs such as materials, equipment and labor, the breakdown of indirect costs and cost sheets.es_ES
dc.disciplineIngeniería y TI/ Engineering and IT
dc.facultyFacultad de Ingeniería
dc.formatPDFes_ES
dc.identifier.urihttps://repositorio.unitec.edu/xmlui/handle/123456789/12912
dc.languageEspañoles_ES
dc.publisherUniversidad Centroamericana UNITECes_ES
dc.rightsAttribution-NonCommercial-ShareAlike 3.0 United States*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-sa/3.0/us/*
dc.sourceUniversidad Tecnológica Centroamericana UNITECes_ES
dc.subjectRediseñoes_ES
dc.subjectCarreteraes_ES
dc.subjectPavimentaciónes_ES
dc.subjectRasantees_ES
dc.subjectLa Limaes_ES
dc.thesis.degreelevelGrado
dc.thesis.degreenameIngeniería Civil / I-03
dc.titlePropuesta de rediseño estructural de pavimento en poza los alcaldes, La Lima, Cortés, 2023es_ES

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Propuesta de rediseño estructural de pavimento en poza los alcaldes, La Lima, Cortés, 2023.pdf
Size:
22.81 MB
Format:
Adobe Portable Document Format
Description:
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: