Estudio de prefactibilidad para la implementación de un centro de distribución para Pollopolis, Distrito Central
dc.campus | Unitec Tegucigalpa | |
dc.catalogador | Regina Matamoros | |
dc.collection | Tesis de Postgrado | |
dc.contributor.advisor | Luis Jiménez Pineda | |
dc.contributor.author | Gerald José Reyes Gutierrez | |
dc.coverage | Tegucigalpa, Francisco Morazán, Honduras | |
dc.date.accessioned | 2025-09-24T17:18:33Z | |
dc.date.available | 2025-09-24T17:18:33Z | |
dc.date.issued | 2025-08-01 | |
dc.description.abstract | El presente estudio está destinado a analizar la viabilidad de implementar un centro de distribución (CEDI) para Pollopolis, el cual es una empresa de comida rápida con 9 sucursales en el Distrito Central. Pollopolis enfrenta muchos problemas relacionados al sistema de abastecimiento actual considerando que es un proceso descentralizado, con deficiencias en la gestión de inventarios y altos costos logísticos. El estudio contó con una metodología divida en tres fases: estudio financiero, estudio técnico y estudio de mercado. Se utilizaron encuestas, entrevistas y recolección de datos históricos para la recopilación de los datos. El estudio de mercado identificó una situación deficiente de abastecimiento por medio de las encuestas a operadores de Pollopolis. En el estudio técnico se definió la ubicación óptima del CEDI en Colonia Tiloarque con una capacidad de almacenamiento de 22.5 m3 siendo mayor a la demanda semanal de 12.23 m3. El estudio financiero proyectó una Tasa Interna de Retorno (TIR) del 49% superior al costo de capital del 11.85%, lo que confirmó la rentabilidad del proyecto. En conclusión, se determinó que la implementación del CEDI es factible desde una perspectiva técnica, de mercado y financiera, contribuyendo significativamente al crecimiento operativo de Pollopolis. | |
dc.description.abstract | This study aims to analyze the feasibility of implementing a distribution center (CEDI) for Pollopolis, a fast-food company with 9 branches in the Central District of Honduras. Pollopolis currently faces significant issues with its supply system, which is decentralized, inefficient in inventory management, and generates high logistics costs. The study followed a methodology divided into three phases: financial, technical, and market analysis. Surveys, interviews, and historical data collection were used to gather relevant information. The market study identified a deficient supply situation based on surveys conducted with Pollopolis operators. The technical study defined the optimal location for the CEDI in Colonia Tiloarque, with a storage capacity of 22.5 m³, exceeding the weekly demand of 12.23 m³. The financial study projected an Internal Rate of Return (IRR) of 49%, which is higher than the cost of capital at 11.85%, confirming the project’s profitability. In conclusion, the implementation of the CEDI was determined to be feasible from technical, market, and financial perspectives, significantly contributing to the operational growth of Pollopolis. | |
dc.discipline | Administración y Negocios / Business & Management | |
dc.faculty | Facultad de Postgrado | |
dc.finalwork.creationdate | 01/08/2025 | |
dc.format | ||
dc.identifier.uri | https://repositorio.unitec.edu//handle/123456789/13651 | |
dc.language.iso | es | |
dc.publisher | Universidad Tecnológica Centroamericana UNITEC | |
dc.rights | Attribution-NonCommercial-ShareAlike 4.0 International. | |
dc.rights.uri | https://creativecommons.org/licenses/by-nc-sa/4.0 | |
dc.source | Universidad Tecnológica Centroamericana UNITEC | |
dc.subject | Centro de distribución | |
dc.subject | Comida rápida | |
dc.subject | Inventarios | |
dc.subject | Rentabilidad | |
dc.subject | Abastecimiento | |
dc.subject.ddc | 658.421 R457 | |
dc.thesis.degreelevel | Postgrado | |
dc.thesis.degreename | Maestría en Gestión de Operaciones y Logística / M-25 | |
dc.title | Estudio de prefactibilidad para la implementación de un centro de distribución para Pollopolis, Distrito Central |
Files
Original bundle
1 - 1 of 1
Loading...
- Name:
- Estudio de prefactibilidad para la implementación de un centro de distribución para Pollopolis, Distrito Central-1.pdf
- Size:
- 1.61 MB
- Format:
- Adobe Portable Document Format
License bundle
1 - 1 of 1
No Thumbnail Available
- Name:
- license.txt
- Size:
- 1.71 KB
- Format:
- Item-specific license agreed upon to submission
- Description: